Ammonium Nitrate Production
Capabilities
Detailed engineering
Facility performance reviews
Project management
Fabrication and construction
Start up and commissioning
Facility / plant optimization studies
Troubleshooting of process operations
Design of pipeline, facility piping and pressure vessel
Management of change (MOC)
3D modeling
Pipeline system flow modeling
Rotating equipment sizing and specification
Process control design
Pipeline, pump & metering systems
Nitric & sulphuric acid modelling
Previous Projects
-
Ammonium Nitrate Emulsion (ANE) Plant
Lanmark provided detailed engineering, design, project management, procurement services, and construction support for a new ANE production facility.
Project details:
Emulsion production rate: 11 ton/d
ANS flow rate: 800 L/min
Surfactant flow rate: 400 L/min
Diesel flow rate: 225 L/min
Steam flow rate: 80 L/hr
75,000 L ANS tank storage
40 ton emulsion storage silo
-
Granulation Plant Dedusting System
This project involved the review and redesign of the dedusting system at a petrochemical plant; the existing system was taken out of service shortly after the plant’s commissioning due to internal build-up in the fan and ducting which required continuous cleaning to function properly.
Lanmark’s objective was to improve reliability and functionality with minimal maintenance. This was achieved by performing a site visit, FEED study, and detailed design.
-
Steam Turbine Upgrade
Lanmark provided engineering and support to ensure the successful field installation of a 23,000 HP upgraded drop-in replacement turbine during a scheduled plant turnaround.
Project details:
Auxiliary piping connections (drain, steam seal, lube and control oil, coupling cover vents, etc.) required piping field fitting.
A connection comparison was performed to anticipate necessary changes and develop cost estimates; to do this, Lanmark used a laser scan to create a model of the existing piping system.