Ammonia & Urea Production and Handling
Capabilities
Front end development
Detailed engineering
Project management
Onsite construction utilizing Kellogg ammonia process
Liquid and dry storage facilities
Plant upgrades
Optimization and debottlenecking of facilities
Brownfield design and installation
Stress analysis
Piping support design
Design and construction oversight of bulk cryogenic storage, ammonia spheres, sales pumps and pipeline
Truck and rail loading and unloading with measurement
Vessel removal and Installation
Polishing or deionization system
Previous Projects
-
Urea Stripper Replacement
Lanmark reviewed an engineering package for the replacement of a Urea stripper to identify discrepancies and interferences between the vessel, piping, and structural steel.
Project details:
2,000 MTPD Urea fertilizer
Minimized plant downtime by designing a complete as-built model of the Urea stripper system
Provided stress analysis and piping support design,
Identified piping design discrepancies prior to installation.
-
Ammonia Plant
This project involved the FEED design and integration of a new 1,500 sTPD Ammonia facility to an existing brownfield site.
Lanmark represented the owner as Project Manager, overseeing detailed engineering, field construction, and commissioning of all the OSBL facilities, storage, and shipping solutions of the Ammonia facility.
-
Power Boiler Replacement
Lanmark was engaged to generate project plans and related cost estimates to complete the removal and installation methods for a vessel scheduled to be replaced at a 2,000 MTPD Urea plant.